How to Calculate Concrete Yards for a Slab
Order too little concrete and the pour stops. Order too much and you pay for waste. The math is simple.

The formula
Length in feet times width in feet times thickness in feet gives cubic feet. Divide by twenty-seven for cubic yards.
Add a little extra
Add about ten percent for uneven ground, spillage and a slab that is slightly thicker in places.
Bags or truck
A cubic yard needs about forty-five 80-pound bags. Beyond about a yard and a half, a truck is easier and costs less per yard.
A worked example
A twenty by twelve foot patio at four inches is 2.96 cubic yards. With ten percent extra, order about 3.3 yards.
The short version: Do the math, add ten percent, and use a truck for anything past a yard or two. The yardage calculator does it for you.
Services for this
- Driveways and Flatwork
Concrete Patio Installation
A solid backyard floor for dining, grilling and gathering
- Driveways and Flatwork
Concrete Pad and Slab Pouring
Flat pads for sheds, equipment, generators and air conditioners
- Commercial and Industrial
Concrete Pumping and Placement
Pump trucks that deliver concrete where trucks cannot reach
Ready to pour something solid?
Call or send the form. You get a clear written quote after we measure, in person or from photos.