Control Joint Spacing Planner
Slab size and thickness in. Joint spacing, panels and saw-cut length out.
How to read it
Control joints give concrete a planned weak line to crack along. A common rule is to space them no farther apart than two and a half feet for every inch of slab thickness, so a 4 inch slab is jointed about every 10 feet. Panels should be close to square, and no longer than one and a half times as long as wide. Joints are cut about one quarter of the thickness deep, within 6 to 18 hours of finishing. Your engineer or code may require tighter spacing.
Services that go with it
- Repair and Restoration
Control and Expansion Joint Repair
Sealed joints keep water, weeds and ants out of the slab
- Repair and Restoration
Concrete Crack Repair
Fill, seal and stabilize cracks before water makes them worse
- Driveways and Flatwork
Concrete Driveway Installation
A new concrete driveway built on a compacted base, jointed to stay crack-free
Ready to pour something solid?
Call or send the form. You get a clear written quote after we measure, in person or from photos.


