Concrete Driveway Replacement: What to Expect
Replacing a driveway is a few days of work and a week or two before you are back to normal.

Day one: remove
The old slab is saw cut, broken out and hauled away. Utilities are marked first.
Day two: prep
The base is re-graded and compacted, forms are set and rebar is placed, with drainage fixed.
Day three: pour
Concrete is placed, screeded, floated, finished and jointed. The driveway is closed to everyone.
The next weeks: cure
Foot traffic comes back in a day or two, cars at about a week and heavy vehicles after two to four weeks.
The short version: Plan on a few days of work and about a week without cars. The base and the cure decide how long it lasts.
Services for this
- Driveways and Flatwork
Driveway Replacement and Widening
Tear out the cracked old drive and pour a better one, or add the width you need
- Repair and Restoration
Concrete Removal and Demolition
Safe breaking, hauling and recycling of old concrete
- Driveways and Flatwork
Concrete Driveway Installation
A new concrete driveway built on a compacted base, jointed to stay crack-free
Ready to pour something solid?
Call or send the form. You get a clear written quote after we measure, in person or from photos.